Adding the outwales is the part that for some reason took me six months to complete. Oh yeah, summer happened. I emailed John, asking him whether I should try to laminate both of the outwales pieces on each side simultaneously, or do them one at a time. He said that if I had time, I should do them one at a time. Well, I'm not exactly a speed demon about building this boat, am I? One at a time it is.
![](//lh4.google.com/steve.noname/R4cP12oZh8I/AAAAAAAAAcA/FCLukPZKdJk/DSCN3984.JPG?imgmax=912)
First port (April 2007).
![](//lh3.google.com/steve.noname/R4cP2moZh9I/AAAAAAAAAcI/38eoMuYaFJ4/DSCN3014.JPG?imgmax=912)
Then starboard (May 2007).
![](//lh5.google.com/steve.noname/R4cP5GoZiAI/AAAAAAAAAcg/xbDZ8TGinpg/DSCN3017.JPG?imgmax=912)
Then the second piece to the port (May 2007).
![](//lh4.google.com/steve.noname/R3XV4rPc8pI/AAAAAAAAAaI/WOvHc0zLteg/DSCN6467.JPG?imgmax=912)
And the final piece to the starboard (December 2007!).